420God
Well-Known Member
Now that the heat wave is gone I can get back to work. I got the posts cut and notched the other day and yesterday I got my first truss set into place.
I had to rig up an extension arm for my payloader so I can lift the trusses the 16ft needed to set them on the posts.
I had to rig up an extension arm for my payloader so I can lift the trusses the 16ft needed to set them on the posts.