Retired engineer
Well-Known Member
An awesome day, all the way around. Buttoned up for another hour and a half of light, 6 hrs of dark then the lights come back on at 0300. Moving them around is getting to be an autopilot thang…I have the process to set them up and hang all the lights and mylar covered panels down to around 20 minutes. Few trips up and down the stairs to get my steps in for the day…
gave them a top dressing of FF Strawberry Fields and some Dynomyco for good measure, and removed all the LST clips and other restraints. They will probably maintain their shapes since the stalks/branches are pretty stiff.
gave them a top dressing of FF Strawberry Fields and some Dynomyco for good measure, and removed all the LST clips and other restraints. They will probably maintain their shapes since the stalks/branches are pretty stiff.