Going to grab some paint at the Labor day sales. Got the texturing and priming done in the living room.
The end of this room is finally no longer looking like fusion power; more 10 years out.
If we get the color up tonight, let it cure for a week before taping back up to texture and finish the ceiling,
I'll actually be done with this room by next week.
Then on to yank up the carpet and patch/paint the guest/room-mate bedroom, about two weeks worth of work, then have new carpet installed and the downstairs is 100% again. The next two rooms (dining room and library) will be a piece of cake compared to the living-room since they won't be being used as storage space anymore and I can install the floating floor we bought last year. I can see the end to this almost decade long remodel, or at least a point where there will be period of time all the rooms in the house are operational.
The kitchen needs a full make-over, but that discussion is a big one given it's a full redesign with the ceiling and a wall coming out and a new peninsula/pass through. Everyone's agreed I get at few months off between this litany of repairs and that task.