Mhmm... I'm starting to think you got this figured out!
AH! That helps me makes sense of it better in my mind!
Thanks mate! I will be back on that one in some time. Putting pipes in uniseals is no easy job, and I can barely lift bag of soil. My buddy helped me put it together and then take it apart, and then put together the hdx. Don't think they'll want to do that right again, but I will slowly start getting things figured out once I have a little bit of spare time will get started again slowly.
If I can get the Brutes to work they'll be a mean flowering system, and then I can use my HDX to veg.
(But for now, I need to get this HDX system working correctly!)
--------------------
If I keep the pump on the bottom where it is, but add feed lines to each side, do you think that would be enough to allow me to use my (small 300gph) pump at full speed? Currently running it restricted (pressure is like when you leave a faucet on low) and that's the only way the buckets stay levelled right now.
>New lines would be the same 3/4" bulkheads with 3/4" piping, like in between the containers currently.
> If it does work would you recommend I put the pump in the res and top feed, or would it be fine just the way it is with added lines on each side?
> and my temp has been a solid 64.4F/18C for a week now and I don't expect it to get any warmer here (if anything it will get colder)... is it safe to say I can get rid of my water chiller?
My buddy is worried adding more bulkheads to the containers will cause problems/leaks/ containers won't hold up? (he's not a hydro guy... just a good friend and muscle.)
View attachment 4115241