OneMoreRip
Well-Known Member
All done, few loose ends but those don't count. So, all done!
Actually took like 12 hours. Short break only and had to run to home depot for paint.
The plants spent all day in the bathroom, (had to blackout a window and door). The bathroom smells amazing now. Mostly N.P.
Couple other projects. Light rack and fan rack but I want to grab 2 more of those hanging fans first. They are really great because they barely do anything, good for only 2' of space.

Actually much quite than before because I got rid of the pc fan that sounded like a jet. And no muffler on the intake either. Really really happy about that because there is no space for a muffler
Actually took like 12 hours. Short break only and had to run to home depot for paint.
The plants spent all day in the bathroom, (had to blackout a window and door). The bathroom smells amazing now. Mostly N.P.
Couple other projects. Light rack and fan rack but I want to grab 2 more of those hanging fans first. They are really great because they barely do anything, good for only 2' of space.




Actually much quite than before because I got rid of the pc fan that sounded like a jet. And no muffler on the intake either. Really really happy about that because there is no space for a muffler