Get your self an electrician. All you need to know is that every 3rd leg to ground is 220. And most likey your have 400amps ran 110 or 44000 watts.
Way off base.Get your self an electrician. All you need to know is that every 3rd leg to ground is 220. And most likey your have 400amps ran 110 or 44000 watts.
Simple math.How so
Only time three phase is more efficient is when primary loads are three phase devices. This generally means larger motor loads, typical to industrial applications.If I wanted to run about 180-200A@240V two phase, would it be better to do it via three phase?
And why?
That's where my intuition was leading me, thanks for the confirmation.Only time three phase is more efficient is when primary loads are three phase devices. This generally means larger motor loads, typical to industrial applications.
Split phase is inherently better suited to the grower.
In some very large > 50 ton operations, three phase service is used for HVAC and a split phase service for lighting.