I think the real issue is that you save on vege time, because you can offset the plants to always have one ready to chop, also this is a handy tool for medical patients, cause if you can pull 1lb off 1 plant every month, your gonna be hard set to stay under your max weight, where as the single crop puts you at risk of having way more than washington's 1 1/2 lbs at a time. but I dont recall which state Ravenholm was in.but is it really more product?
if I harvest say 1lb every 3 weeks or 3 lbs every nine? same thing, just faster turn over.
I figure I defiantly cant fit anymore then 15 plants in that space comfortably in 1gal bags. That would be 5 every three weeks @ 3zips a pop, 1 oz shy of a lb.
I'm starting to lean towards non topped clones (or 7"-9" tall), as many as I can jam in. I could easily jam 30 in there this way...at least I think I could.
but is it really more product?
if I harvest say 1lb every 3 weeks or 3 lbs every nine? same thing, just faster turn over.
I figure I defiantly cant fit anymore then 15 plants in that space comfortably in 1gal bags. That would be 5 every three weeks @ 3zips a pop, 1 oz shy of a lb.
I'm starting to lean towards non topped clones (or 7"-9" tall), as many as I can jam in. I could easily jam 30 in there this way...at least I think I could.
that looks good^^^right now I run a 4x4 with a 1k hps. I have 6 ladies jammed in atm. As you can see its pretty packed.
![]()
Thats why with zero veg time I can see fitting a lot in. But if I veg for 3 weeks....lol I'm doubting 15 may work.
nah RAW...its in the works, just ordered a Sentinel CHHC - 4 and a Sentinel DRT-1. I have to build the room...cost around $500 for wood, insulation, panda film staple/ductape
I'll be getting the Co2 tank and regulator soon too. The room is being built by a friend of mine whos a contractor. I'm good...but not like him. Hopefully the room will be done by end of the month.
it will look like this:
![]()
the floor will be raised by 6-8" ....picture one large 7x7 drip tray made of treated wood lines with poly film, on a slight angle ...run off will run down to a hole and drain out to a separate res. for dumping.