volcomrider157
Well-Known Member
Thanks for the link tom. I'm thinking my Idea will work well, after breaking it down and finding out what I need for the job, im gonna need a bit more tubing than I thought. Its basically gonna look like a grid of tubes in a pvc frame thats 16"x11" the radiator will sit in the bottom of the res with the bubble stones under it to help distribute the cool water molecules. It will take about 32' of tubing for each radiator. so after both radiators + the additional tubing to hook em up to the cooler system we're looking at about 70 ft of tubing! So I got a 100' ft roll for $9.90+ shipping. cant wait til it gets here!