Every build project has it hiccups and unexpected mishaps ,this build was no expectation. For me the largest issue was ups and usps. Yes the parcel service and the post offiice. Both companies drop the ball on rhe deliveries. Ups signature requirements make for some long days and nights waitng for packages just to get a notice that had tried to be delivered st 9 oclock while you were sitting on the porch waiting for them . One guy actuall parked in front the house for 3 mins never got out and drove off with my package as i was attempting to walk to his truck to get my stuff. He told me it was heavy package so he was gonna drop a few more off then come back to my house lol yeah right.
Then you have usps. Who decided it wasnt worth there time to even attempt to make a delivery. For most of there packages i had to go there at 8 in the morning and just wait fornthe truck to unload and get them with is far from the priority mail service that was purchased. The other issue was equipment, one of the lights didnt come with hangers making it impossible to hang anothe light came with a 240 plug instead of a 120 like the rest. Ordered a co troller from ebay that didnt work( i should have known better lol) and im still waiting on the main hose for the autopots that didnt come in with the other stuff. And the aeroponic system was missng parts. Though it didnt stop the grow it did slow it down waiting for replacement parts but all in all the delays were minimal.. so with the clones in pots and everything just about set up this is what everything looks like.