dbz
Well-Known Member
I think i mentioned this above but tandem breakers would solve your quandry. If you want up to code though, then most code on new circuits in living areas, closets etc require AFCI circuits of which I am unaware of any tandem, in which case the up to code answer would be either a new 200 amp service or a 50 or 100 amp subpanel most commonly. A sub panel can be wired to your main panel but it would not increase the capacity or total draw availability beyond the 200 amps of the main board. A seperate service would require a new service wire to the meter to a separate panel.