greasemonkeymann
Well-Known Member
damn dude...It is a slow start on the shingles so far, but it will get done.
I had to do the bottom floor @ true 8' studs so that the PowerRack would fit. Between that and the floor studs, there was a 12'' gap between the levels. Next is the rabbit cage!
I wanna move in with you..
I lift weights outside under a tarp, got a preacher setup and an olympic bench, and I gotta sandblast and repaint my shit every two yrs or so to keep em from rusting