So I've been saying over and over how I was going to start a thread and just never do so here it goes.
The Build:
The building of the greenhouse was a long process. It started on 6/4 and didn't end until 7/1.
So this was attempt one.
First we had to move an entire roof by hand out of the way. (The seller built it and it wasnt to code so he had to tare it down and start the roof over)
Then we leveled and built the frame.
Next the end walls
and finally the plastic.
When it was done it looked great, however we didn't secure some supports correctly and messed up some minor things that lead to be major problems.
The Build:
The building of the greenhouse was a long process. It started on 6/4 and didn't end until 7/1.
So this was attempt one.
First we had to move an entire roof by hand out of the way. (The seller built it and it wasnt to code so he had to tare it down and start the roof over)
Then we leveled and built the frame.
Next the end walls
and finally the plastic.
When it was done it looked great, however we didn't secure some supports correctly and messed up some minor things that lead to be major problems.
Attachments
-
44.6 KB Views: 57
-
1.7 MB Views: 60
-
1.8 MB Views: 65
-
33.6 KB Views: 70
-
1.1 MB Views: 74
-
2 MB Views: 75
-
1.6 MB Views: 82
-
36.3 KB Views: 71
-
1.2 MB Views: 71
-
1.8 MB Views: 66