Hello,
So i need some help.. I built a 4 site system (Under Current design). 5 Gal round connected with 1.5inch Sched. 40 pipe. My return line is 3/4 with a 400gph pump. My flow is good and no leaks.. My issue is my (Res./Control) bucket is no where near the same water level and the 4 sites. All...